Case Studies

A strong background in unlocking potential.

Barton Road, Urmston

57 Dwellings

We evaluate your land’s potential with trusted experts to uncover opportunities, minimise delays, and provide a clear path forward ...

Read case study

Askern, Doncaster

Aldi Store and 72 Dwellings

The site was allocated as white land and open space in the local plan. It included an abandoned dwelling, various outbuildings ...

Read case study

Woodwalk, Barnsley

83 Affordable Dwellings

The site was allocated as greenbelt and had title connections to other parcels in the area. Major challenges ...

Read case study

Radcliffe Road, Darcy Lever

42 Affordable Dwellings

The site is divided into two parcels with multiple owners, with an existing long term tenant. Several complex title issues ...

Read case study

Cowlersley Lane, Huddersfield

42 Dwellings

The site was allocated as white land and open space in the local plan. It included an abandoned dwelling, various outbuildings ...

Read case study

Silverbell Close, Bolton

11 Dwellings

The site owner is in the process of securing adverse possession of the land, which is not designated for any specific use in the local plan ...

Read case study

Vicars Hall Lane, Worsley

11 Dwellings

The site owner is in the process of securing adverse possession of the land, which is not designated for any specific use in the local plan ...

Read case study
Two decades redefining land challenges

Learn how our hands-on experience, collaborative approach, and documented processes have shaped a proven method for guiding landowners, developers, and communities toward lasting solutions.

Askern, Doncaster
Outcome
Aldi Store and 72 Dwellings
Companies Involved
Site History
The previous site owners spent over 10 years trying to unlock the site's development potential. Key challenges included multiple land allocations, flood risk, adjacency to a railway, invasive species, ground stability issues, and the need to relocate pylons. Additionally, low £/sqft values, low demand, and viability concerns added to the complexity.
Allocation
Greenfield
Legal/Disposal
14 Challenges
Dev Potential & Loss
9 Challenges
Radcliffe Road, Darcy Lever
Outcome
42 Affordable Dwellings
Companies Involved
Site History
The site is divided into two parcels with multiple owners, with an existing long term tenant. Several complex title issues and geographical constraints were identified, including a main gas mains & PROW running directly through the site and major ecology concerns.
Allocation
Greenfield
Legal/Disposal
14 Challenges
Dev Potential & Loss
8 Challenges
Woodwalk, Barnsley
Outcome
83 Affordable Dwellings
Companies Involved
Site History
The site was allocated as greenbelt and had title connections to other parcels in the area. Major challenges included significant high-wall mining issues, noise from nearby highways, a pylon located across the site, and level concerns affecting drainage.
Allocation
Greenbelt
Legal/Disposal
4 Challenges
Dev Potential & Loss
8 Challenges
Cowlersley Lane, Huddersfie..
Outcome
42 Dwellings
Companies Involved
Site History
The site had been classified as a stalled site by Kirklees Council for many years due to a range of complexities. These included surrounding properties, visual splay requirements, rights of access to rear gardens on legal titles, adverse possession claims, and other historically recorded impacts. These issues made it virtually impossible to commence building, despite previous approvals. The previous landowner spent tens of thousands of pounds on wasted applications and time with no progress.
Allocation
Housing Land
Legal/Disposal
43 Challenges
Dev Potential & Loss
6 Challenges
Silverbell Close
Outcome
11 Dwellings
Companies Involved
Site History
The site owner is in the process of securing adverse possession of the land, which is not designated for any specific use in the local plan. The site presents several challenges, including topographical issues, the close proximity of surrounding properties complicating site layout, as well as mining concerns and the presence of knotweed
Allocation
Whiteland
Legal/Disposal
2 Challenges
Dev Potential & Loss
6 Challenges
Vicars Hall Lane, Worsley
Outcome
11 Dwellings
Companies Involved
Site History
The site was originally purchased from Peel Holdings with outline planning permission; however, the consent had several title and boundary issues that would have made the houses unsellable. Additionally, at that time, Cube did not have a development team capable of building the homes within the allocated budget.
Allocation
Housing Land
Legal/Disposal
4 Challenges
Dev Potential & Loss
2 Challenges
Barton Road, Urmston
Outcome
57 Dwellings
Companies Involved
Site History
The site was allocated as white land and open space in the local plan. It included an abandoned dwelling, various outbuildings from multiple businesses that had operated there over the years, and faced several challenges, including rights of way issues, flood risk, severely overgrown vegetation, and an unregistered land parcel.
Allocation
Whiteland Open Space
Legal/Disposal
4 Challenges
Dev Potential & Loss
8 Challenges
Start now