he site is split into two parcels with multiple owners and includes an existing long-term tenant. Several complex title issues and geographical constraints were identified, including a main gas main, a public right of way running through the site, and significant ecology concerns.
We focused first on resolving title restrictions and legal issues. Once these were addressed, we shifted to ecological considerations and site layout, which were then handed over to Great Places—along with a detailed list of impacts to be managed both before and during the planning process.